top of page
FUEL TANK REPLACEMENT
Overview
ALLY Construction Services managed the demolition of an oil tank and installation of a replacement. The new 366,000 gallon tank was 27 feet tall with a 50 feet in diameter.
The team successfully completed the three-month project working within a leading pharmaceutical client's campus rules and pharmaceutical regulations protocol, such as, additional fire watch and air monitoring for a restricted area, that required a permit.​
Specs
Client: Leading Pharmaceutical Research Company
Size: 366K Gallons
Type: Infrastructure Replacement
1/3
bottom of page